Turkey’s Solar Energy Potential and Unlicensed Solar Power Plant Projects

Türkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh/m².year. This potential is seen more efficiently, especially in the southern regions.

Considering the projected costs for an unlicensed megawatt solar power plant project, a detailed plan is required for the equipment to be installed and the required space. For example, for a 1 MW power plant, equipment such as approximately 4,000 260/265 Watt solar panels, aluminum construction mounting systems, inverters, and remote monitoring systems are required. In addition, elements such as land preparation, landscaping and security systems should also be taken into consideration.

MaterialAmount
Solar Panel4.000 pcs
Aluminium Mounting SystemsNot specified
Inverter25 kW, 40 pcs
Remote Monitoring SystemNot specified
Solar Cables and ConnectionsNot specified
Three-Phase Bidirectional Electricity Meter1 pcs
Lightning rodNot specified
Fence, Excavation, ConstructionNot specified
Land requirement21.000m²
Project DetailsQuantity
Solar PV Panel4.000 pcs
25 kW Inverter40 pcs
Control and Monitoring System4 pcs
Fixed Mounting Structure1 set
DC cabling21.000 m
Combiner box1 set
Fence and Gate Works1.000 m²
Landscaping and Earthworks1.500 m³
Lightning Protection Systems1 set
Video Security Systems1 set
Transformer, Kiosk, Cells, Power Line Works1 set
Labour1 set
AC cabling3.750 m

Regional evaluation of projects is important. For example, if a 1 MW solar power plant is established in a region with high solar potential such as Mersin, monthly and annual electricity production can be estimated. In this planning, the economic return of the investment should also be taken into account. The state’s energy purchase guarantee and incentives offer investors a profitable perspective in the long term.

However, when calculating costs and returns, the advantages of domestic production and the impact of national regulations should not be ignored. Particularly in unlicensed solar energy projects, encouraging local production and providing support in this direction plays an important role.

This information can serve as a guide for those who want to invest in solar energy. A balanced evaluation of geographical location, costs and returns of the project can form the key elements for a successful solar energy project.

RegionSunshine Duration (hours/year)Incoming Solar Energy (kWh/m².year)
South-eastern Anatolia30001.460
Mediterranean2.956–
Eastern Anatolia2.664–
Central Anatolia2.628–
Aegean Region2.738–
Marmara2.409–
Black Sea1.9711.120

Solar Energy Data for Mersin Province

MonthsInstalled kWhEstimated kWhkW produced90% Performance*
January1.000617,4093.783,0684.404
February1.000620,50100.421,7290.379
March1.000632,50140.389,70126.350
……………
December1.000627,5085.591,0077.031
TOTAL1.000665,602.023.411,591.821.070

Cost and Return Calculations

MonthsReturn with Local Module Incentive ($)Return without Local Module ($)
January12.99811.225
February13.91812.020
March19.45816.804
………
December11.86210.245
TOTAL280.444242.202
Free site survey

Let’s plan your project together

Tell us what you need and we will prepare a roadmap with the right solution, installation schedule and cost.