{"id":15838,"date":"2023-12-19T16:27:52","date_gmt":"2023-12-19T16:27:52","guid":{"rendered":"https:\/\/duranka.com\/?p=15838"},"modified":"2024-06-15T23:33:58","modified_gmt":"2024-06-15T20:33:58","slug":"solar-power-plant-sample-project-details","status":"publish","type":"post","link":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/","title":{"rendered":"Solar Power Plant Sample Project Details"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Turkey&#8217;s Solar Energy Potential and Unlicensed Solar Power Plant Projects<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially in the southern regions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Considering the projected costs for an unlicensed megawatt solar power plant project, a detailed plan is required for the equipment to be installed and the required space. For example, for a 1 MW power plant, equipment such as approximately 4,000 260\/265 Watt solar panels, aluminum construction mounting systems, inverters, and remote monitoring systems are required. In addition, elements such as land preparation, landscaping and security systems should also be taken into consideration.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img fetchpriority=\"high\" fetchpriority=\"high\" decoding=\"async\" width=\"920\" height=\"433\" src=\"https:\/\/duranka.com\/wp-content\/uploads\/2023\/12\/433-1.jpg\" alt=\"\" class=\"wp-image-15841\" srcset=\"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1.jpg 920w, https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1-400x188.jpg 400w, https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1-768x361.jpg 768w, https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1-860x405.jpg 860w, https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1-430x202.jpg 430w, https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1-700x329.jpg 700w, https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/433-1-150x71.jpg 150w\" sizes=\"(max-width: 920px) 100vw, 920px\" \/><\/figure>\n<\/div>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Material<\/th><th>Amount<\/th><\/tr><\/thead><tbody><tr><td>Solar Panel<\/td><td>4.000 adet<\/td><\/tr><tr><td>Al\u00fcminyum Konstr\u00fcksiyon Sistemleri<\/td><td>Belirtilmemi\u015f<\/td><\/tr><tr><td>\u0130nvert\u00f6r<\/td><td>25 KW, 40 adet<\/td><\/tr><tr><td>Uzaktan \u0130zleme Sistemi<\/td><td>Belirtilmemi\u015f<\/td><\/tr><tr><td>Solar Kablo ve Ba\u011flant\u0131lar<\/td><td>Belirtilmemi\u015f<\/td><\/tr><tr><td>Trifaze \u00c7ift Y\u00f6nl\u00fc Elektrik Sayac\u0131<\/td><td>1 adet<\/td><\/tr><tr><td>Paratoner<\/td><td>Belirtilmemi\u015f<\/td><\/tr><tr><td>\u00c7it, Hafriyat, \u0130n\u015faat<\/td><td>Belirtilmemi\u015f<\/td><\/tr><tr><td>Arazi Gereksinimi<\/td><td>21.000m\u00b2<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Proje \u0130\u00e7eri\u011fi<\/th><th>Miktar\/adet<\/th><\/tr><\/thead><tbody><tr><td>Solar PV Panel<\/td><td>4.000 Adet<\/td><\/tr><tr><td>25 KW \u0130nverter<\/td><td>40 Adet<\/td><\/tr><tr><td>Kontrol ve \u0130zleme Sistemi<\/td><td>4 Adet<\/td><\/tr><tr><td>Sabit Montaj Yap\u0131s\u0131<\/td><td>1 Set<\/td><\/tr><tr><td>DC Kablolama<\/td><td>21.000 Metre<\/td><\/tr><tr><td>Toplama Panosu<\/td><td>1 Set<\/td><\/tr><tr><td>\u00c7it ve Kap\u0131 \u0130\u015flemleri<\/td><td>1.000 m\u00b2<\/td><\/tr><tr><td>Peysaj ve Toprak \u0130\u015fleri<\/td><td>1.500 m\u00b3<\/td><\/tr><tr><td>Y\u0131ld\u0131r\u0131mdan Korunma Sistemleri<\/td><td>1 Set<\/td><\/tr><tr><td>Video G\u00fcvenlik Sistemleri<\/td><td>1 Set<\/td><\/tr><tr><td>Trafo, K\u00f6\u015fk, H\u00fccreler, ENH \u0130\u015fleri<\/td><td>1 Set<\/td><\/tr><tr><td>\u0130\u015f\u00e7ilik<\/td><td>1 Set<\/td><\/tr><tr><td>AC Kablolama<\/td><td>3.750 Metre<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Regional evaluation of projects is important. For example, if a 1 MW solar power plant is established in a region with high solar potential such as Mersin, monthly and annual electricity production can be estimated. In this planning, the economic return of the investment should also be taken into account. The state&#8217;s energy purchase guarantee and incentives offer investors a profitable perspective in the long term.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, when calculating costs and returns, the advantages of domestic production and the impact of national regulations should not be ignored. Particularly in unlicensed solar energy projects, encouraging local production and providing support in this direction plays an important role.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This information can serve as a guide for those who want to invest in solar energy. A balanced evaluation of geographical location, costs and returns of the project can form the key elements for a successful solar energy project.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>B\u00f6lge<\/th><th>G\u00fcne\u015flenme S\u00fcresi (saat\/y\u0131l)<\/th><th>Gelen G\u00fcne\u015f Enerjisi (kWh\/m\u00b2.y\u0131l)<\/th><\/tr><\/thead><tbody><tr><td>G\u00fcneydo\u011fu Anadolu<\/td><td>3000<\/td><td>1.460<\/td><\/tr><tr><td>Akdeniz<\/td><td>2.956<\/td><td>&#8211;<\/td><\/tr><tr><td>Do\u011fu Anadolu<\/td><td>2.664<\/td><td>&#8211;<\/td><\/tr><tr><td>\u0130\u00e7 Anadolu<\/td><td>2.628<\/td><td>&#8211;<\/td><\/tr><tr><td>Ege B\u00f6lgesi<\/td><td>2.738<\/td><td>&#8211;<\/td><\/tr><tr><td>Marmara<\/td><td>2.409<\/td><td>&#8211;<\/td><\/tr><tr><td>Karadeniz<\/td><td>1.971<\/td><td>1.120<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mersin \u0130li G\u00fcne\u015f Enerjisi Verileri<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Aylar<\/th><th>Kurulu kWh<\/th><th>\u00d6ng\u00f6r\u00fclen kWh<\/th><th>\u00dcretilen kW<\/th><th>%90 Performans*<\/th><\/tr><\/thead><tbody><tr><td>Ocak<\/td><td>1.000<\/td><td>617,40<\/td><td>93.783,06<\/td><td>84.404<\/td><\/tr><tr><td>\u015eubat<\/td><td>1.000<\/td><td>620,50<\/td><td>100.421,72<\/td><td>90.379<\/td><\/tr><tr><td>Mart<\/td><td>1.000<\/td><td>632,50<\/td><td>140.389,70<\/td><td>126.350<\/td><\/tr><tr><td>&#8230;<\/td><td>&#8230;<\/td><td>&#8230;<\/td><td>&#8230;<\/td><td>&#8230;<\/td><\/tr><tr><td>Aral\u0131k<\/td><td>1.000<\/td><td>627,50<\/td><td>85.591,00<\/td><td>77.031<\/td><\/tr><tr><td>TOPLAM<\/td><td>1.000<\/td><td>665,60<\/td><td>2.023.411,59<\/td><td>1.821.070<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Maliyet ve Getiri Hesaplamalar\u0131<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Aylar<\/th><th>Yerli Mod\u00fcl Te\u015fvikli Getiri ($)<\/th><th>Yerli Mod\u00fcl Olmaks\u0131z\u0131n Getiri ($)<\/th><\/tr><\/thead><tbody><tr><td>Ocak<\/td><td>12.998<\/td><td>11.225<\/td><\/tr><tr><td>\u015eubat<\/td><td>13.918<\/td><td>12.020<\/td><\/tr><tr><td>Mart<\/td><td>19.458<\/td><td>16.804<\/td><\/tr><tr><td>&#8230;<\/td><td>&#8230;<\/td><td>&#8230;<\/td><\/tr><tr><td>Aral\u0131k<\/td><td>11.862<\/td><td>10.245<\/td><\/tr><tr><td>TOPLAM<\/td><td>280.444<\/td><td>242.202<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Turkey&#8217;s Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its<\/p>\n","protected":false},"author":1,"featured_media":15842,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[17],"tags":[],"class_list":["post-15838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technical-articles"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"Turkey&#039;s Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Y\u00f6netici\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Duranka Technology -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Solar Power Plant Sample Project Details - Duranka Technology\" \/>\n\t\t<meta property=\"og:description\" content=\"Turkey&#039;s Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/10\/cropped-duranka-icon.jpeg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/10\/cropped-duranka-icon.jpeg\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-12-19T16:27:52+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-06-15T20:33:58+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/@durankateknoloji\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@duranka_tech\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Solar Power Plant Sample Project Details - Duranka Technology\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Turkey&#039;s Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@duranka_tech\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/10\/cropped-duranka-icon.jpeg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#blogposting\",\"name\":\"Solar Power Plant Sample Project Details - Duranka Technology\",\"headline\":\"Solar Power Plant Sample Project Details\",\"author\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/author\\\/admin\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/ges-santral.jpg\"},\"datePublished\":\"2023-12-19T16:27:52+03:00\",\"dateModified\":\"2024-06-15T23:33:58+03:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#webpage\"},\"articleSection\":\"Technical Articles\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.duranka.com\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/category\\\/technical-articles\\\/#listItem\",\"name\":\"Technical Articles\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/category\\\/technical-articles\\\/#listItem\",\"position\":2,\"name\":\"Technical Articles\",\"item\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/category\\\/technical-articles\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#listItem\",\"name\":\"Solar Power Plant Sample Project Details\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#listItem\",\"position\":3,\"name\":\"Solar Power Plant Sample Project Details\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/category\\\/technical-articles\\\/#listItem\",\"name\":\"Technical Articles\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/#organization\",\"name\":\"Duranka Technology\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/\",\"telephone\":\"+905366222412\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/logo-back.png\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/@durankateknoloji\\\/\",\"https:\\\/\\\/x.com\\\/duranka_tech\\\/\",\"https:\\\/\\\/www.instagram.com\\\/duranka.tech\",\"https:\\\/\\\/tr.linkedin.com\\\/company\\\/duranka\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/author\\\/admin\\\/#author\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/author\\\/admin\\\/\",\"name\":\"Y\\u00f6netici\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/71fe1f174a78e55115f72bf9b12941eabd7b8d79c1b6873700985b7e893e7a0a?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Y\\u00f6netici\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#webpage\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/\",\"name\":\"Solar Power Plant Sample Project Details - Duranka Technology\",\"description\":\"Turkey's Solar Energy Potential and Unlicensed Solar Power Plant Projects T\\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\\\/m\\u00b2.year. This potential is seen more efficiently, especially\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/author\\\/admin\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/author\\\/admin\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/ges-santral.jpg\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/solar-power-plant-sample-project-details\\\/#mainImage\"},\"datePublished\":\"2023-12-19T16:27:52+03:00\",\"dateModified\":\"2024-06-15T23:33:58+03:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/\",\"name\":\"Duranka Technology\",\"alternateName\":\"DURANKA\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.duranka.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Solar Power Plant Sample Project Details - Duranka Technology","description":"Turkey's Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially","canonical_url":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#blogposting","name":"Solar Power Plant Sample Project Details - Duranka Technology","headline":"Solar Power Plant Sample Project Details","author":{"@id":"https:\/\/www.duranka.com\/en\/author\/admin\/#author"},"publisher":{"@id":"https:\/\/www.duranka.com\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/ges-santral.jpg"},"datePublished":"2023-12-19T16:27:52+03:00","dateModified":"2024-06-15T23:33:58+03:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#webpage"},"isPartOf":{"@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#webpage"},"articleSection":"Technical Articles"},{"@type":"BreadcrumbList","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en#listItem","position":1,"name":"Home","item":"https:\/\/www.duranka.com\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en\/category\/technical-articles\/#listItem","name":"Technical Articles"}},{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en\/category\/technical-articles\/#listItem","position":2,"name":"Technical Articles","item":"https:\/\/www.duranka.com\/en\/category\/technical-articles\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#listItem","name":"Solar Power Plant Sample Project Details"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#listItem","position":3,"name":"Solar Power Plant Sample Project Details","previousItem":{"@type":"ListItem","@id":"https:\/\/www.duranka.com\/en\/category\/technical-articles\/#listItem","name":"Technical Articles"}}]},{"@type":"Organization","@id":"https:\/\/www.duranka.com\/en\/#organization","name":"Duranka Technology","url":"https:\/\/www.duranka.com\/en\/","telephone":"+905366222412","logo":{"@type":"ImageObject","url":"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/11\/logo-back.png","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#organizationLogo"},"image":{"@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/@durankateknoloji\/","https:\/\/x.com\/duranka_tech\/","https:\/\/www.instagram.com\/duranka.tech","https:\/\/tr.linkedin.com\/company\/duranka"]},{"@type":"Person","@id":"https:\/\/www.duranka.com\/en\/author\/admin\/#author","url":"https:\/\/www.duranka.com\/en\/author\/admin\/","name":"Y\u00f6netici","image":{"@type":"ImageObject","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/71fe1f174a78e55115f72bf9b12941eabd7b8d79c1b6873700985b7e893e7a0a?s=96&d=mm&r=g","width":96,"height":96,"caption":"Y\u00f6netici"}},{"@type":"WebPage","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#webpage","url":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/","name":"Solar Power Plant Sample Project Details - Duranka Technology","description":"Turkey's Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.duranka.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#breadcrumblist"},"author":{"@id":"https:\/\/www.duranka.com\/en\/author\/admin\/#author"},"creator":{"@id":"https:\/\/www.duranka.com\/en\/author\/admin\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/12\/ges-santral.jpg","@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/#mainImage"},"datePublished":"2023-12-19T16:27:52+03:00","dateModified":"2024-06-15T23:33:58+03:00"},{"@type":"WebSite","@id":"https:\/\/www.duranka.com\/en\/#website","url":"https:\/\/www.duranka.com\/en\/","name":"Duranka Technology","alternateName":"DURANKA","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.duranka.com\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Duranka Technology -","og:type":"article","og:title":"Solar Power Plant Sample Project Details - Duranka Technology","og:description":"Turkey's Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially","og:url":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/","og:image":"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/10\/cropped-duranka-icon.jpeg","og:image:secure_url":"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/10\/cropped-duranka-icon.jpeg","article:published_time":"2023-12-19T16:27:52+00:00","article:modified_time":"2024-06-15T20:33:58+00:00","article:publisher":"https:\/\/www.facebook.com\/@durankateknoloji\/","twitter:card":"summary_large_image","twitter:site":"@duranka_tech","twitter:title":"Solar Power Plant Sample Project Details - Duranka Technology","twitter:description":"Turkey's Solar Energy Potential and Unlicensed Solar Power Plant Projects T\u00fcrkiye has an enormous solar energy potential due to its geographical location. According to the Solar Energy Potential Atlas, the annual sunshine duration in our country is 2,737 hours and the total annual solar energy is 1,527 kWh\/m\u00b2.year. This potential is seen more efficiently, especially","twitter:creator":"@duranka_tech","twitter:image":"https:\/\/www.duranka.com\/en\/wp-content\/uploads\/2023\/10\/cropped-duranka-icon.jpeg"},"aioseo_meta_data":{"post_id":"15838","title":null,"description":null,"keywords":[],"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-06-12 09:46:21","updated":"2025-07-21 17:05:36","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.duranka.com\/en\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.duranka.com\/en\/category\/technical-articles\/\" title=\"Technical Articles\">Technical Articles<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSolar Power Plant Sample Project Details\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.duranka.com\/en"},{"label":"Technical Articles","link":"https:\/\/www.duranka.com\/en\/category\/technical-articles\/"},{"label":"Solar Power Plant Sample Project Details","link":"https:\/\/www.duranka.com\/en\/solar-power-plant-sample-project-details\/"}],"_links":{"self":[{"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/posts\/15838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/comments?post=15838"}],"version-history":[{"count":2,"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/posts\/15838\/revisions"}],"predecessor-version":[{"id":16320,"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/posts\/15838\/revisions\/16320"}],"wp:attachment":[{"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/media?parent=15838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/categories?post=15838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.duranka.com\/en\/wp-json\/wp\/v2\/tags?post=15838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}